更重要的是先問三個問題:
1|現場最需要處理哪一種高風險?
MEWP 防夾與障礙物風險、棚架 Putlog 狀態,還是高風險區的火警及煙霧監察?
2|現有設備是否可整合?
包括 MEWP 型號、既有 CCTV、現場網絡,以及 CMP/控制平台安排。
3|警報後,誰負責跟進?
系統、通知、紀錄與現場行動,必須連成同一套可執行的流程。
更新後的 DEVB TC(W) No. 3/2023 合約條文新增三類智能安全系統:
• Smart Monitoring System for Mobile Elevating Work Platform
• Smart fire and smoke detection system
• Smart Monitoring System for Scaffolding Putlog
不同工程的合約要求、現場風險與設備相容性都不同。先做技術評估,才能規劃合適的 4S 方案。
聯絡 AutoSafe 免費領取客制方案。
Contact AutoSafe to get your free tailored solution.
Following the 2026 4S update, project teams should ask more than: “Which system should we buy?”
Start with three questions:
1 | Which high-risk activity needs attention on site?
MEWP entrapment and obstacle risks, scaffolding putlog conditions, or fire and smoke monitoring in high-risk areas?
2 | Can existing systems be integrated?
Consider MEWP models, existing CCTV, site networks, and CMP or control-platform arrangements.
3 | Who owns the follow-up after an alert?
Systems, notifications, records and site action need to work as one practical process.
The updated DEVB TC(W) No. 3/2023 contract provisions add:
• Smart Monitoring System for Mobile Elevating Work Platform
• Smart fire and smoke detection system
• Smart Monitoring System for Scaffolding Putlog
Every project has different contract requirements, site risks and equipment constraints. Technical assessment should come before solution planning.
Contact AutoSafe to get your free tailored solution.#4S #SmartSiteSafetySystem #MEWP #SmartFireAndSmokeDetection #ScaffoldingPutlogMonitoring #ConstructionSafety #AutoSafe